In July 2013 SRG Global was awarded the contract to work in conjunction with Peddle Thorpe Architects to remediate the Argent Hall apartments located in Auckland City. This project was a high-rise leaky apartment building made up of ten levels and 107 apartment units in total. The scope consisted of:
Fixing the rain screens over the sealant joints proved to be extremely complex as the vertical and horizontal alignments of the GRC with the façade were different in width. These screens were made up of two main components that were pre-manufactured to modular sizes and then had to be altered on site due to the as-built conditions the team were required to work with.